General Risk Assessment & Hazard Register

General Risk Assessment & Hazard Register

(or sooner if significant change, incident or annually)
Persons at Risk – tick all that apply:

STEP 1 – Identify Hazards, Existing Controls & Evaluate Risk

# Hazard Description Persons at Risk Existing Control Measures Initial Risk
(L × S = R)
Additional Controls / Actions Required Residual Risk
(L × S = R)
Action By (Name / Role) Target Date Date Completed Supporting Evidence Upload

Risk Rating Guide

Likelihood (L): 1 Rare    2 Unlikely    3 Possible    4 Likely    5 Almost Certain
Severity (S): 1 Insignificant    2 Minor    3 Moderate    4 Major    5 Catastrophic
Risk (R) = Likelihood × Severity

Risk ScoreRisk LevelAction Guidance
1 – 4LowAcceptable – maintain existing controls. Review annually.
5 – 12MediumTolerable – improve controls where reasonably practicable and monitor.
15 – 25HighUnacceptable – suspend activity until risk is reduced to an acceptable level.

STEP 2 – Communicate Findings


STEP 3 – Review & Sign‑Off


REVIEW RECORD

Review Date Reason for Review Summary of Amendments Reviewed By Signature
Add rows as required

This assessment – together with all supporting evidence uploaded – must be retained for a minimum of three (3) years or longer if required by company policy or applicable legislation.